COMEANDSE

HK  interior  renovation  work  involves  much  waste  on  construction  materials  and  time  by  reconstructing  new substrates for wall and ceiling.

By  our  experiences  on  Design  +  Build  services  in  HK,  the  cost  involved  for  these  base  construction  works  was easily  over  10%  of  overall  construction  cost.  Building  substrate  structure  normally  takes  much  time  before applying  finish  materials  which  obviously  affects  overall  construction  schedule.  After  all,  through  utilizing  existing condition as basic substrates, how much you can save will be more than you can imagine.

Here,   the   new   dessert   cafeteria   and   bar   is   designed   to   exercise   of   this   10%   +   cost   savings   as   well   as environmental friendly interior renovation for HK.

Location
2nd floor, T.K.O. NT, HK
Area
Net Floor Area 1400 sf
Status
Commissioned
CATEGORIES
SHARE